Announcement: $30 Billion Investment in Mahshahr Petrochemical Zone by the Persian Gulf Petrochemical Brokers Group

دفتر خدمات گردشگری کهن دیار پارس

33620541 023 number-call

بهترین ها را با ما تجربه کنید

تجربه های شکار

Progress rate

٪

about

Duration:

Project Type:

Execution Method:

View Project

Progress rate

٪89

Kohandiyar Pars Travel & Tourism Agency

Duration: 360 days

Project Type: Developmental

Execution Method: EPC

In the name of Allah, the Merciful Nature, with all its animal and plant species, is considered a complete natural complex and an evolved ecosystem, and people should be aware that if this great God-given resource is not used wisely, future generations will be deprived of this divine blessing. In this regard, the preservation and […]

View Project

Progress rate

٪48

Northern Project Improvement Plan

Duration: 260 days

Project Type: Constructive

Execution Method: EPC

This project has been designed with the goal of increasing production capacity and improving the quality of petrochemical products in the northern region of the country. Considering the strategic location of this complex near gas resources and access to open waters, a comprehensive plan for developing new units has been prepared. Main Axes of the […]

View Project

Progress rate

٪68

Iranol Quality Improvement Plan

Duration: 280 days

Project Type: Developmental

Execution Method: EPC

This plan has been designed to enhance efficiency and reduce operational costs at the Iranol Petrochemical Complex. Production efficiency is improved through optimization of chemical processes and upgrading of key equipment. Installing new catalysts in the main reactors leads to an increased conversion rate of raw materials into high-value products. Reconstruction of heat exchangers and […]

View Project

Progress rate

٪25

Northern Power Plant Optimization Plan

Duration: 180 days

Project Type: Developmental

Execution Method: EPC

The optimization of the Northern Power Plant encompasses a series of strategic measures aimed at enhancing the performance and efficiency of the facility. Phase One: Thermal Efficiency and Fuel Optimization The first step involves improving fuel consumption and increasing the plant’s thermal efficiency through the installation of advanced heat recovery systems. These systems reclaim lost […]

View Project

Progress rate

٪78

Improvement Plan for IRALCO Efficiency

Duration: 360 days

Project Type: Constructive

Execution Method: EPS

This plan has been designed with the aim of enhancing efficiency and reducing operational costs at the Iranol Petrochemical Complex. Production efficiency will be improved through optimization of chemical processes and upgrading of key equipment. The installation of new catalysts in main reactors will result in a higher conversion rate of raw materials into valuable […]

View Project